Network Strategy

    Network Modeling: When to Add Your Next DC

    Optum Engineering Team
    February 28, 2025
    12 min read

    Adding distribution capacity is a multimillion-dollar decision. Network modeling provides the analytical framework to determine optimal timing, location, and facility specifications while quantifying transportation cost impacts.

    Signs You Need Additional Capacity

    Distribution networks reach capacity constraints when existing facilities cannot process peak volumes, service levels deteriorate, or transportation costs escalate due to geographic gaps. Identifying these triggers early allows strategic planning rather than reactive expansion.

    Capacity Warning Indicators

    • Existing DC operating above 85 percent utilization during peak
    • Increasing parcel shipments to distant zones
    • Growing backorder frequency or delayed shipments
    • Transportation spend growing faster than revenue
    • Limited expansion capability at current locations

    The Network Modeling Process

    Network optimization starts with data. Customer locations, order volumes, product velocity, and transportation costs feed analytical models that simulate various DC configurations. Models test scenarios including facility count, location, size, and inventory allocation strategies.

    Data Requirements

    Accurate modeling requires 12 to 24 months of shipment data including customer zip codes, order weights, SKU profiles, and current freight costs. Historical growth rates and future volume projections inform capacity planning. Product dimensions and handling characteristics affect facility sizing.

    Transportation Cost Modeling

    Transportation typically represents 50 to 70 percent of total logistics spend. Adding strategically located capacity reduces average shipment distance, lowering per-unit freight costs. Models quantify savings across LTL, parcel, and FTL modes. Zone skipping and regional consolidation opportunities emerge from analysis.

    Transportation Savings Example

    National retailer adding West Coast DC:

    • Before: Single Midwest DC, $8M annual freight
    • After: Two-DC network, $5.2M annual freight
    • Savings: $2.8M annually (35% reduction)
    • Payback: 2.5 years on facility investment

    Service Level Improvements

    Geographic proximity enables faster delivery and expanded 1-2 day ground service coverage. E-commerce operations particularly benefit from reduced delivery times and lower expedited shipping costs. Models quantify the revenue impact of improved delivery promises and customer satisfaction.

    Facility Location Analysis

    Optimal DC location balances customer proximity, labor availability, real estate costs, and transportation infrastructure. Major metros offer workforce depth but command premium real estate rates. Secondary markets provide cost advantages while maintaining reasonable accessibility. Location decisions span 10 to 20 year horizons, requiring long-term perspective.

    Site Selection Criteria

    • Customer density: Concentration of delivery destinations
    • Labor market: Availability and cost of warehouse workforce
    • Transportation access: Highway, rail, and airport proximity
    • Real estate costs: Building and land pricing trends
    • Carrier presence: LTL and parcel carrier terminal locations

    Inventory Implications

    Multi-DC networks require inventory duplication, increasing working capital requirements. Safety stock rises as SKUs spread across facilities. Network design must balance transportation savings against inventory carrying costs. Advanced inventory allocation strategies and demand forecasting minimize capital impact.

    Build vs. Lease Decision

    Purpose-built facilities offer configuration control and long-term cost certainty. Leased space provides flexibility and lower initial capital requirements. Most operators favor long-term leases (10 to 15 years) in established markets. Build-to-suit arrangements combine lease flexibility with custom specifications.

    Phased Implementation Strategy

    Large network expansions often phase over 18 to 36 months. Initial capacity addresses immediate constraints while proving demand assumptions. Subsequent phases add capacity based on actual performance. This approach reduces financial risk and allows operational learning before full commitment.

    Typical Expansion Timeline

    Network Analysis3-6 months
    Site Selection6-12 months
    Facility Design & Permitting4-8 months
    Construction/Tenant Improvements6-12 months
    Ramp-Up to Full Capacity3-6 months

    The Role of 3PLs

    Third-party logistics providers offer rapid capacity expansion without capital investment. 3PL partnerships provide geographic coverage, seasonal flex capacity, and operational expertise. Hybrid strategies combining owned facilities with 3PL capacity optimize cost and flexibility. Network models evaluate the financial and operational tradeoffs.

    Making the Decision

    Network expansion requires executive commitment and cross-functional coordination. Financial analysis must show clear ROI within acceptable payback periods. Operational leaders verify capacity assumptions and implementation feasibility. Strategic alignment ensures the network supports long-term business objectives and growth plans.

    Ready to Model Your Network?

    Optum provides comprehensive network modeling and site selection services. We analyze your shipment data, model scenarios, and recommend optimal facility locations with detailed ROI projections.